See how big a goal is, and what each task is for

Two views of the same tasks. The Treemap draws a goal and everything under it as boxes inside boxes, so the biggest parts of the plan take the most room. Flow follows one task up through its parents to the goals it serves, and down to its own subtasks.

Treemap: bigger box, more tasks inside
Flow: wider link, more paths through it

What the Treemap shows

The Treemap draws a task and all its subtasks as nested boxes. Every task counts as one, so a box is as big as the number of tasks inside it, itself included. The color is the status: blue for open, green for completed, grey for cancelled, a shade darker on each level down.

The biggest branch sits in the top-left corner. Each parent box has a strip with its name and how many subtasks it has. Click a box to open the task, or right-click it to zoom the Treemap in on that task. The path at the top takes you back up.

Under Visualization Controls, Hide Done takes finished work off the board, Show Priority paints open tasks red, yellow or blue by priority and puts them first, and Layout switches between five ways of cutting the boxes.

  • Box size: the number of tasks inside it
  • Blue: open
  • Green: completed
  • Grey: cancelled
  • Rose: open and past its deadline
  • Right-click a box to zoom in on it

Rewind the Treemap

The Evolution slider under the toolbar moves the Treemap back in time, one day, week, month, quarter or year per step. A task turns green only from the day it was completed, so pressing play shows a goal filling in the way it really did.

With Show future on, which is the default, the slider also runs past today to the last deadline on the board. A task turns lime once the slider reaches the end of the period it is due in, and rose once that period is over and the task is still open.

What the Flow view shows

Flow is a Sankey diagram centered on one task. Its parents, and their parents, run in from the left back to the top-level goals. Its subtasks run out to the right, three levels deep by default. A link is as wide as the number of paths that run through it.

A task that sits under several parents gets one route in from each of them. When one of those parents serves two goals itself, its link into your task is twice as wide. Colors follow priority: red, yellow and blue for priority 1, 2 and 3, grey for none, green once completed and orange once cancelled.

Click any task in the diagram to center Flow on it, or right-click it to open it. Checkboxes above the diagram hide finished tasks, hide the labels, set how many levels of subtasks to draw, and show or hide the other parents of those subtasks.

  • Link width: how many paths run through it
  • Left: parents, up to the top-level goals
  • Right: subtasks, 3 levels by default
  • Click a task to center Flow on it
  • Right-click a task to open it

Which one to open

Open the Treemap when the question is how much work a goal holds and how much of it is left. Open Flow when the question is why a task matters: which goals it moves forward, and through which steps.

For a picture of one goal with every level as a ring, there is also Graph View.

How to open the Treemap and Flow

01

Open the Treemap

Click Treemap in the sidebar to see All Tasks, or choose Open Treemap in a task’s menu to start from that task.

02

Open Flow

Choose Open Flow View in a task’s menu. Flow always starts from a task, so it has no sidebar entry.

03

Move around

Right-click a box to zoom the Treemap in on it. In Flow, click a parent or subtask to center the diagram on it.

Frequently asked questions

What does the size of a box in the Treemap mean?
The number of tasks inside it, the task itself included. Every task counts as one, whatever its time or effort, so a goal with forty subtasks takes about four times the room of one with ten. There is no option to size boxes by time.
What do the colors in the Treemap mean?
Blue is open, green is completed and grey is cancelled, each a shade darker on deeper levels. With Show future on (the default), an open task past its deadline is rose and one due by the moment on the slider is lime. Show Priority paints open tasks red, yellow or blue for priority 1, 2 or 3.
What do the link widths in the Flow view mean?
A link is as wide as the number of paths that run through it, where a path goes from a top-level goal down through the task’s parents to the task, or from the task down through its subtasks to the last level shown. A wide link marks a route that several goals share.
How do I open the Flow view?
Open a task’s menu and choose Open Flow View. Flow is not in the sidebar because it always starts from one task. A task with no parents and no subtasks has nothing to draw.
How are tasks with several parents shown?
In the Treemap, once, under the first parent it is found at, so it is not counted twice. Uncheck Show Tasks Once to draw it under every parent. In Flow, each parent is a separate route into the task.
Are the Treemap and Flow free?
Yes. Both views are on the free plan with no Pro badge. The free plan’s limits are on tasks, not views: 5 direct subtasks per task and 5 tasks per period.
Are encrypted tasks shown?
Yes, and they keep their place and size. Until you unlock them with your password, the Treemap labels them ENCRYPTED and Flow shows the start of the task’s ID instead of its title. Both views are drawn in your browser, and our database only holds the scrambled title.

Find out where your goals go

Break a goal into subtasks, then open the Treemap to see its size and Flow to see what each task is for.

Start for FreeNo credit card